
TILBURY
THE PARTY WALL PEOPLE
We are the No. 1 experts at implementing the Party Wall Etc. Act 1996 in the Tilbury area. If you want some free advice - we can prepare and serve party wall notices, undertake schedules of condition and if required, produce and serve party wall awards (party wall agreements).
Our 100% 5-star rating on Google speaks to our professional, personal and expert service
We hold memberships with the Faculty of Party Wall Surveyors (FPWS) and the Chartered Association of Building Engineers (CABE)
We carry Public Liability and Professional Indemnity Insurance.
The Party Wall People are based in Chelmsford, Essex and travel to client’s premises all over the southeast of England.
If you have any questions about the party wall act, please feel free to contact us for a free, no obligation consultation.
WHAT IS THE PARTY WALL ACT?
The Party Wall etc. Act 1996 protects both sides when building work affects a shared wall, a boundary or the ground next to a neighbour’s building. It lets your project go ahead, provided your neighbours get the right notice first.
Work that normally needs a notice includes cutting into a party wall for steelwork,
removing a chimney breast, building on the boundary (the line of junction) and digging foundations within 3 metres of a neighbouring building, or in some cases 6 metres. If a neighbour doesn’t consent in writing within 14 days, a dispute is treated as having arisen and surveyors are appointed to agree a Party Wall Award. Getting the notices right at the start avoids delays later.
Email us a copy of your drawings and we’ll send a competitive fee proposal for handling the party wall side for you.
TILBURY: A SURVEYOR'S VIEW
Tilbury’s architecture is closely tied to its industrial and maritime history, with worker
cottages and post-war social housing near the docks. These properties often face
environmental challenges that inland towns do not. A common issue is the vibration risk from heavy port traffic combined with the relatively light construction of older terraces.
When a homeowner plans a structural project, we focus on making sure the new works don’t create a rigid point in a row of houses that needs to stay somewhat flexible because of the local environment.
The ground in Tilbury is heavily influenced by the River Thames, with thick layers of
Alluvium (clay, silt and peat). This is compressible ground with a high water table, which often makes traditional trench foundations unsuitable. Most modern extensions in Tilbury need raft foundations or piling to reach stable strata.
What this means for your project:
Under the Party Wall etc. Act 1996, piling is a notifiable work and comes with vibration risks. We have drafted party wall awards that include strict monitoring clauses, so your deep-foundation project doesn’t cause structural distress to the neighbouring homes.
Questions Tilbury homeowners ask:
What work do I have to notify neighbours about? Notifiable work includes excavating within 3 metres of a neighbour’s property, removing a chimney from a party wall, cutting into a party wall for steelwork, or building a new wall on the boundary. We serve the notices for you.
Get in touch:
Contact TPWP now for free, friendly, expert advice on party wall matters.
01245 526 762
